Bangalore–Mysore Expressway – Information & Status

119 km Bengaluru – Mysuru Expressway project on NH-275 is an under construction 6-10 lane access-controlled highway with a route alignment in Karnataka.

This mix of brownfield-upgrade (60%) and greenfield (40%) project was envisioned as an alternate to the now-scrapped Nandi Infrastructure Corridor Enterprises (NICE) Road.

This project under Bharatmala Pariyojana (BMP) has a deadline of October 2022. It consists of 2 phases: 58 km Phase 1 between Bengaluru – Nidaghatta and 61 km Phase 2 between Nidaghatta – Mysore. It will have a total of 19 large bridges, 44 small bridges and 4 railway overbridges (ROBs) and 50 underpasses for vehicles and pedestrians.

Greenfield sections will form bypasses around Bidadi (7 km), Ramanagara-Channapatna (22 km), Maddur (7 km including 3.5 km of elevated highway), Mandya (10 km) and Srirangapatna (7 km). Toll booths will be built at Kumbalgodu and Srirangapatna.

  • Total Estimated Cost: Rs. 8,066 crore
  • Completion Deadline: October 2022
  • Project’s Length: 119 km
  • Lanes: 6 – 10
  • Owner: National Highway Authority of India (NHAI)
  • Status: Under Construction
  • Project Model: Hybrid Annuity Mode (HAM)

Tenders & Contractors

The project consists of 2 packages each with a 2 year deadline.

Package & LengthContractor
Package 1: Bengaluru – Nidaghatta (58 km)Dilip Buildcon Ltd. (DBL)
Package 2: Nidaghatta – Mysore (61 km)Dilip Buildcon Ltd. (DBL)